NGA Public Consultation

17 December 2021

1. INTRODUCTION AND BACKGROUND

The eSussex project, led by East Sussex County Council, aims to get as close to 100% superfast coverage as possible.

To achieve this, East Sussex County Council intends to invest in further coverage of NGA broadband infrastructure (capable of delivering download speeds of at least 30 Mbps) in areas within its existing Programme Area where such broadband is currently unavailable, by June 2022.

ESCC completed its original public consultation under the National Broadband Scheme for the United Kingdom (referred to hereafter as the 2016 NBS) in May 2017.

Following completion of the public consultation, ESCC completed an open procurement in respect of the remaining area without NGA broadband infrastructure (known as "white NGA"), which comprised 7,220 premises. It awarded contract to British Telecommunications plc.

As set out under paragraph 89 of the 2016 NBS, ESCC wishes to include further coverage within the scope of the existing intervention area. This is mainly to replace premises that have been descoped from the contract as a result of a national data refresh by the supplier on speed measurements and other changes to the reference data (e.g. premises no longer existing) since the contract was awarded.

ESCC needs to ensure that the further coverage proposed continues to target NGA white areas. Therefore, it is required to run a new mapping and public consultation exercise for the area concerned as more than three years have lapsed since the public consultation for the whole intervention area identified in the tender.

2. MARKET ENGAGEMENT AND ANALYSIS OF EXISTING COVERAGE

ESCC conducted an OMR between November 2016 and December 2016 to establish existing and planned (within the 3 years) coverage of broadband infrastructure across East Sussex. This included both commercial coverage by existing and prospective NGA broadband infrastructure providers and coverage procured under ESCC’s existing contracts with British Telecommunications plc. A public consultation was subsequently published to determine the intervention area and to enable ESCC to target NGA white areas with public funds. The public consultation closed in May 2017 and enabled targeting of public funds for 3 years from closure.

ESCC contacted all known broadband infrastructure operators within the Programme Area and other providers known to have (or potentially having) plans to deploy new networks across the UK with a formal request for information. The OMR and public consultation were publicised through the eSussex and DCMS websites.  Operators were requested to provide information on their existing and planned NGA broadband infrastructure (capable of delivering download speeds of at least 30 Mbps), and to provide detail of their coverage at a premise level so as to enable greater granularity of mapping.

This information, together with ESCC's own data sources, was used to define the existing intervention area for the project.

This further public consultation sets out areas where additional build is proposed to replace the premises no longer in the build plan, so as to enable all interested stakeholders (including the public, businesses, internet service providers and broadband infrastructure operators) to comment on the proposals. In particular, this provides an opportunity for broadband infrastructure operators to review ESCC’s mapping to ensure that these areas can still be considered NGA white.

All responses to the public consultation will be carefully considered and where necessary will be incorporated into the final map of the intervention area. The final intervention area maps and a summary report confirming details of the changes made to the existing intervention area will be published on the eSussex website after the close of the consultation period. Where responses to the consultation are received, ESCC will respond to these and provide an explanation of how the information submitted has been treated. The finalised intervention area will then be submitted to BDUK’s National Competence Centre (NCC) for approval against the State aid Framework.

3. STATE AID FRAMEWORK AND RULES

This section provides a brief introduction to the State aid Framework for the purpose of informing responses to the public consultation.  Respondents may wish to obtain their own professional/legal advice on the application of the State aid Framework and rules that relate to this proposal.

The European Commission has published 'EU Guidelines for the application of State aid rules in relation to the rapid deployment of broadband networks' (2013/C 25/01'.1 These guidelines summarise the principles of the Commission's policy in applying the State aid rules of the Treaty to measures that support the deployment of broadband networks, and seek to ensure that State aid schemes for broadband are well-designed so that they target market failures and minimise negative effects on competition.

The guidelines require public interventions to be targeted so as to limit the risk of crowding out private investments, of altering commercial investment incentives and ultimately of distorting competition.

Planned public interventions can seek State aid approval directly from the Commission, or (as is the case with this proposal) seek clearance under a national scheme which has been pre-approved by the Commission.

Projects under the 2016 NBS will need to demonstrate their State aid compliance (in accordance with the terms of the scheme) in order to receive clearance from BDUK's National Competence Centre.

The Commission's guidelines distinguish between two types of broadband networks, namely basic broadband and NGA networks.

Basic broadband networks are generally those based on currently widely-deployed technologies such as fixed wired telephony networks (using ADSL/ADSL2+ technologies), non-enhanced cable TV networks (eg DOCSIS 2.0), mobile networks (2G/3G (UMTS)), some fixed wireless access (FWA) networks, and satellite networks.

NGA networks rely wholly or partly on optical elements (optical fibre) and are capable of delivering an enhanced broadband capability compared to existing basic broadband networks. Current qualifying NGA technologies are fibre-based networks (FTTx), advanced upgraded cable networks (DOCSIS 3.0) and certain advanced wireless access networks capable of delivering reliable high speeds.

Guidance on the characteristics of qualifying NGA technologies is available from BDUK.2

The Commission's guidelines also require that public intervention should be able to ensure a 'step change' in broadband availability.  This is demonstrated by:

  • Significant new investments in the broadband network;
  • The new infrastructure brings significant new capabilities to the market in terms of broadband service availability and capacity, speeds and competition;3

The 'step change' in broadband availability shall be compared to that of existing as well as concretely planned networks.

The Commission's guidelines also distinguish between geographic areas on the basis of their existing or planned broadband infrastructure:

  • 'White' areas are those in which there is no qualifying broadband infrastructure and none is likely to be developed within 3 years;
  • 'Grey' areas are those where only one network is present or is to be deployed within the coming 3 years; and
  • 'Black' areas are those where at least two networks of different operators exist or will be deployed in the coming 3 years.

NGA networks are mapped on the basis that, amongst other things, they have substantially higher upload speeds (compared to basic broadband networks)4 and are able to deliver broadband services at an access (download) speed of more than 30Mbps.

Public intervention can only take place in white NGA areas under the 2016 NBS. White NGA areas are those in which there are no NGA networks and none is likely to be developed within the next 3 years.

4. EXISTING INTERVENTION

ESCC has used premises level data and has mapped premises as white, grey or black, using the following criteria:

For NGA,

  • A premises is turned grey if there is only one broadband infrastructure operator providing NGA services (with speeds greater than 30Mbps) to that postcode.
  • A premises is turned black if there are at least two broadband infrastructure operators providing NGA services (with speeds greater than 30Mbps) to that postcode.
  • All other premises remain white.

The mapping analysis has identified significant remaining ‘white NGA’ areas as set out below:

NameA) Total Premises in Overall Geographic AreaB) Target NGA White PremisesC) Under Review PremisesD) Out of Scope Premises (NGA Grey or Black)
East Sussex, Brighton and Hove397,76119,124246378,637

ESCC intends to extend coverage within the remaining 'white NGA' areas in East Sussex (excluding Brighton & Hove) using its existing contract with British Telecommunications plc under the 2016 NBS (and in accordance with the Public Contracts Regulations 2015).

5. TIMESCALES

This consultation will be open until 9am on Tuesday 18th January 2022.

Once the consultation is closed and ESCC has verified the intervention areas, additional NGA broadband coverage will be targeted to the 149 premises set out in the public consultation via its existing contract.  The related extended deployment plans for broadband infrastructure should begin by mid-January 2022.

6. STATE AID PUBLIC CONSULTATION

The EU Guidelines (at paragraph 78) and the 2016 NBS set out the requirements to hold a public consultation in order to validate the intervention area mapping by allowing all interested stakeholders an opportunity to comment on the planned aid measure.

The purpose of this document is to fulfil those requirements by publishing a description of the existing aid measure, and seeking feedback from all interested stakeholders. The proposed additional build of NGA broadband is shown in the attached map (Annex A).

The attached map of the NGA broadband Intervention Areas relies on the definitions of white, grey and black areas, as set out in the EU Guidelines (and as summarised above). ESCC will only target the areas identified as White on the map.

This State aid public consultation and the existing NGA broadband Intervention Area map are available to all stakeholders on the eSussex website at https://www.esussex.org/

7. RESPONDING TO THIS STATE AID PUBLIC CONSULTATION

ESCC is requesting information and supporting evidence in relation to basic and NGA broadband infrastructure within the project area and wish to hear from all relevant stakeholders (including residents, businesses as well as broadband infrastructure operators), particularly in relation to areas to be targeted as part of the NGA intervention area at Annex [A].

For the avoidance of doubt, there is no need to respond to this public consultation if you have no comment to make.

For residents and businesses, where this relates to the ability to receive an NGA service, any information provided in response to this State Aid public consultation should as a minimum include (but need not be limited to) the address of the property or area that the submission relates to and the nature of the concern.

If the response is from an infrastructure provider and comments on the white, grey and/or black or under review classifications within the attached maps or data, or on the wholesale products to offered via the subsidised network, then the submission should also include the specific information set out in Section 8.  For infrastructure providers only ESCC will arrange access to the Response Template (or subset thereof if you are reporting on a specific area).

ESCC also requests confirmation from an authorised signatory that the information provided is suitably accurate and up to date.

To register your intention to submit a response as well as to send submissions, these must be sent to broadband@eastsussex.gov.uk .  Your submission must contain the following:

  • Your organisation's name (if applicable)
  • Your organisation's address (if applicable)
  • Your name
  • Position
  • Contact telephone number
  • Email Address

Please send your responses no later than 9am on Tuesday 18th January 2022:

broadband@eastsussex.gov.uk

Please note that the data you provide in your response will be treated as commercially confidential to your organisation. However, it may be necessary to share some or all of your response data with our professional advisers and/or DCMS/BDUK, Ofcom, the National Competence Centre and the European Commission in the course of seeking State aid approval.

It should also be noted that it is a State aid requirement to use this information to produce State aid maps to define white, grey and black areas for NGA broadband. However, the published maps will show the aggregated White/Grey/Black NGA areas, not the data provided on a per-operator basis. The final maps that will be used for extending coverage  will be published  after the conclusion of this State aid public consultation and once approved by the National Competence Centre.

If you have any questions about any of the above, please contact ESCC by email as above.

8. INFORMATION REQUESTED

This section specifies the information you are requested to provide in response to this State aid public consultation in relation to the presence of broadband infrastructure.

ESCC is requesting information on, and supporting evidence f

or, any current or planned (within the next 3 years) investment in broadband infrastructure in the East Sussex area, excluding Brighton and Hove, where this may be in conflict with the proposed NGA intervention area map attached.

For any current or planned coverage not taken into account in the existing State aid intervention areas shown on the attached map, ESCC is requesting information at premises level, using the template issued by ESCC (Annex A) to show existing or planned coverage by your broadband infrastructure investment. By 'covered' (or 'passed') ESCC means that fixed network infrastructure is or will be available to the premises, potentially subject to a final drop connection, or that the premises are able to receive a suitable quality radio signal over the air interface, potentially subject to the installation of a suitable antenna.

Any information provided in response to this State aid public consultation should include, but need not be limited to:

  • Detailed maps for NGA broadband showing existing and planned coverage, for at least the next 3 years.
  • Details of premises covered or passed that fixed network infrastructure is or will be available to the premises within the next 3 years, potentially subject to a final drop connection, or that the premises are able to receive a suitable quality radio signal over the air interface, potentially subject to the installation of a suitable antenna.
  • A detailed description of the technology solution(s) deployed (or to be deployed) in your broadband infrastructure, demonstrating how they meet the minimum standards as set out in the BDUK NGA Technology Guidelines.
  • A description of the services/products currently offered, and separately those services/products to be offered within the next 3 years.
  • Installation, annual/monthly subscription, and additional volume or per-service tariffs for those services/products (identifying whether such tariffs are inclusive or exclusive of VAT).
  • Upload and download speeds typically experienced by end-users, and how these may vary by factors such as distance, increased take-up or demand, contention, etc.
  • Appropriate indicators of the quality of services (e.g. contention ratios, bandwidth allocation per user, etc), including any characteristics (e.g. latency, jitter) that are required to support advanced services such as video conferencing or HD video streaming.
  • Evidence to substantiate actual or planned coverage claims, including business cases and evidence of available funding to enable plans to be fulfilled.
  • Details and planned timing of roll-out of any future investments, including further investments required to cope with future increases in take-up or demand.

Please supplement the required information above with any supporting evidence as you consider appropriate (e.g. links to public websites).

ESCC would also be interested to hear from operators their views as to the types of wholesale access products they would like to see offered on any newly created subsidised NGA network infrastructure. This information may inform the intervention design. Please note that we are not obliged to include these products in any future invitation to tender (unless already required under any State aid Decision).

9. NEXT STEPS

Following any responses received to this State Aid public consultation by the closing date of 9am on Tuesday 18th January 2022, ESCC plans to publish the final Intervention Area maps after the close of the consultation period. Information about the eSussex Programme can be found at:

https://www.esussex.org/

ANNEX A

NGA Map

NGA Map

PREMISES DATA

The embedded document contains a list of premises proposed for inclusion in phase 3 of the Superfast contract. ESCC wants to verify if these premises are still NGA white.

esussex-public-consultation-premise.xlsx


1. http://eur-lex.europa.eu/LexUriServ/LexUriServ.do?uri=OJ:C:2013:025:0001:0026.EN.PDF
*Delete if procurement portal not used.
2. https://www.gov.uk/government/publications/2016-nbs-tech-guidelines
3. See Footnote 66 of the Commission's Guidelines - this sets out that the subsidised network should be pro-competitive (i.e. allow for effective access at different levels of the infrastructure).
4. Substantially higher upload speeds means at least a doubling of the maximum upload speed available on current generation access network(s) for given 'up to' packages available on basic broadband networks in the relevant intervention area.
* Delete as appropriate if premises level data provided.

Further News


Read more news from around East Sussex.

eSussex build update 80

28 July 2023

Fibre to the Premises (FTTP) ultrafast available

eSussex build update 79

07 July 2023

Fibre to the Premises (FTTP) ultrafast available

eSussex build update 78

16 June 2023

Fibre to the Premises (FTTP) ultrafast available

eSussex build update 77

28 April 2023

Fibre to the Premises (FTTP) ultrafast available

eSussex build update 76

24 February 2023

Fibre to the Premises (FTTP) ultrafast available

eSussex build update 75

05 December 2022

Fibre to the Premises (FTTP) ultrafast available